Sde Dov: First PFAS Results for Private Grand Bloc Plots

On November 8, 2026, according to Globes, the Israel Land Authority (RMI) informed the Herzliya court of the first PFAS results for four private Grand Bloc plots in Sde Dov. Plot 2210 exceeds direct soil-contact thresholds; plots 2202, 2204 and 2214 show no exceedance of those thresholds. This first comparison is neither a general clean-site certification nor an announcement of a new allocation date.

What has changed?

Confirmed findings / outstanding questions

Four reports were available: one plot with an exceedance and three without an exceedance of the direct-contact threshold. Other results, any soil-management requirements and the allocation timetable remain outstanding.

PFAS stands for per- and polyfluoroalkyl substances. PFOS, perfluorooctane sulfonate, is one compound in this family; the cited update does not provide a PFOS concentration here for these four plots. RMI is Israel’s land administration authority.

Globes, November 8, 2026: court update

The first four results, plot by plot

Status against PFAS thresholds for direct contact with soil
PlotAvailable finding
2210Confirmed exceedance
2202No exceedance of the direct-contact threshold
2204No exceedance of the direct-contact threshold
2214No exceedance of the direct-contact threshold

Borehole work is complete on the private plots covered by plan TA/4444, but only four reports were available at the update. Completed drilling does not mean that all results have been received and reviewed.

Results and drilling status: Globes

Why plot-level comparison matters

The available results confirm differences between private Grand Bloc plots. They do not justify assigning one environmental status to all of them. The measured situation on 2210 must not automatically be applied to 2202, 2204 or 2214, or to plots whose reports are pending.

Conversely, no exceedance of the direct-contact threshold does not automatically mean a completely clean site or that no soil management is needed. The destination for removed soil must be approved by the Ministry of Environmental Protection.

Regulatory context: Ministry guidelines for Sde Dov

Possible implications for valuation and allocation

Differences in contamination, any required treatment, costs and timing may affect individual plots and allocation coefficients differently. This is a possible consequence to examine, not a quantified adjustment already decided.

About 1,700 owners are awaiting land allocation. The update announces no new lottery or allocation date and does not establish that allocation will resume immediately.

What remains unknown

What this means for a buyer

First identify the actual plot associated with the property under consideration. Ask for its full report, the status of the Ministry’s review and current allocation documents. A general Grand Bloc summary is not a substitute for these records.

A short timeline of reported steps

Timeline reported by Globes

Method and scope

This article distinguishes laboratory findings, administrative decisions and possible consequences. Results and the reporting timeframe are attributed to the RMI update reported by Globes. Ministry guidelines are supplied as regulatory context; automated access to that PDF was unavailable during preparation. This is not personalized legal, medical or financial advice.

Frequently asked questions

Which plot has a confirmed exceedance?

Plot 2210 exceeds the PFAS thresholds applicable to direct contact with soil.

Are plots 2202, 2204 and 2214 certified clean?

No. No exceedance of the direct-contact threshold was found, but this is not a general environmental certification.

Will land allocation resume immediately?

No. Most results remain pending and no new date has been announced.

When are the other results expected?

RMI indicated up to 30 days from the November 8, 2026 update. This refers to results, not completion of treatment or resumption of construction.

Why could this affect land values?

Differences in contamination, treatment, cost and timing may affect plots and therefore allocation coefficients differently. No quantified adjustment is established here.

Sources