An official report dated September 1, 2026 confirms extensive PFOS contamination on plot 305 in the Eshkol sector of Sde Dov. PFOS exceeded the threshold in 12 of the 14 boreholes sampled on August 2–3, 2026, with a peak concentration of 444,000 ng/kg — roughly 70 times the 6,321.4 ng/kg threshold applied to Sde Dov. Plot 305 is owned by developer Ravad and is planned as an office and retail building of about 11 storeys, not housing. The report is not a stop-work order, an approved remediation plan or an estimate of cost or delay. For buyers, it is a documented environmental signal on this specific plot, not evidence about residential plots in general.

Key takeaways

What is confirmed

IndicatorReported value
Report dateSeptember 1, 2026
SamplingAugust 2–3, 2026
Boreholes14
Boreholes above PFOS threshold12 of 14 (all except 1 and 9)
Peak PFOS concentration444,000 ng/kg
Threshold used for Sde Dov6,321.4 ng/kg
Peak / threshold ratio≈ 70×
PFOA, PFHxA, PFHxSNo exceedances recorded

PFAS (per- and polyfluoroalkyl substances) are highly persistent synthetic chemicals. PFOS (perfluorooctane sulfonate) is one of them, and it is the only substance for which the report records exceedances on plot 305.

Exceedances were found in 12 of the 14 boreholes; only boreholes 1 and 9 remained below the threshold. The contamination therefore extends across most of the points tested rather than a single isolated sample.

No exceedances were recorded for PFOA, PFHxA or PFHxS. Quality-control samples returned results close to the primary analyses, supporting the consistency of the measurements.

Israeli Ministry of Environmental Protection — soil investigation report, plot 305, September 1, 2026 (PDF, Hebrew)

Plot 305: location and programme

Plot 305 lies in the Eshkol sector of Sde Dov, near the Ibn Gabirol corridor and the future Zahara Levitov station. It is owned by developer Ravad, which plans an office and retail building of about 11 storeys.

The plot’s architectural plan received conditional approval in May 2026. The environmental report does not by itself change that administrative status; it adds a factor the competent authorities will need to address.

Why it matters for buyers

Plot 305 is not a residential project. Its results do not show that neighbouring residential plots are in the same position: each Sde Dov plot has its own soil investigation, and results differ significantly from one lot to the next.

For a buyer in a residential project, the right question is plot-specific: which soil investigation applies to my plot, what did it find, and what instructions has the Ministry of Environmental Protection issued?

The report is also a reminder that soil management can affect construction schedules in Sde Dov. Contract clauses on delays and environmental costs deserve careful review.

What remains uncertain

Our analysis

Among the Sde Dov plot reports published so far, plot 305 shows one of the most pronounced profiles: exceedances in almost every borehole and a peak close to 70 times the threshold. By comparison, the plot 3205 report described localized exceedances in six samples.

Our reading: the finding is analytically robust, but its operational consequences remain open. It would be wrong to present it as a halted site or a costed clean-up — and equally wrong to play it down.

Frequently asked questions

What is the highest PFOS concentration measured on plot 305?

The peak reading is 444,000 ng/kg, about 70 times the 6,321.4 ng/kg threshold used in the report for Sde Dov.

How many boreholes exceed the PFOS threshold?

12 of 14. Only boreholes 1 and 9 did not exceed the threshold.

Did other PFAS exceed thresholds on plot 305?

No. The report records no exceedances for PFOA, PFHxA or PFHxS.

Has work on plot 305 been stopped?

The report is not a stop-work order. Nor is it an approved remediation plan or an official estimate of cost or delay.

Do these results concern Sde Dov’s homes?

Plot 305 is planned for offices and retail. Its results do not show that residential plots are in the same position; each plot must be checked separately.

Sources

The figures in this article come from the official report dated September 1, 2026, released under freedom of information. Programme details (Ravad, offices and retail, about 11 storeys, conditional approval in May 2026) are taken from the information supplied for this analysis.

Israeli Ministry of Environmental Protection — soil investigation report, plot 305, September 1, 2026 (PDF, Hebrew)

General information

This article is not personalised legal, financial or environmental advice. For a purchase decision, rely on the official documents for your plot and on independent professionals.

Sources